John Deere 512 Loader

John Deere
Make John Deere
Model 512
Type Front End Loaders for Tractors

Your Preferred Location

Description

  • Parking stands and couplers
  • Hydraulic hose and fittings
  • Quick-change attachment carrier
  • Nitro-carbonized (nitrite or black) cylinder rods

Models

Changing attachments

The John Deere quick-change attachment carrier allows one person to quickly change attachments without the use of tools.

Step 1
Retaining pin Retaining pin
Detail of indicated area with pin in storage area Detail of indicated area with pin in storage area

With the bucket level or slightly rolled back, simply remove the retaining pins and place in storage position.

Step 2
Roll the attachment forward to disengage pins Roll the attachment forward to disengage pins

Roll the attachment forward to disengage the lower pins.

Step 3
Lower attachment to ground-disengage top hooks Lower attachment to ground-disengage top hooks

Lower the attachment to the ground to disengage the top hooks.

Step 4
Back away from attachment Back away from attachment

Back away.

To install another attachment simply reverse these steps.

Parking stands and couplers
Parking stand Parking stand
Parking stand coupler Parking stand coupler

For parking the 512 Loader.

 

To see instructions on how to park the loader using the stands, go to parking stand section.

Specifications

  • Key Specs - Boom breakout force: Measured at pivot (Y)<br/>2019 kg<br/>4451 lb<br/>
  • Key Specs - Bucket rollback force capacity: At ground-level line (ZZ)<br/>1410 kgf<br/>3109 lbf<br/>
  • Key Specs - Clearance at full height - bucket dumped (C): 2140 mm<br/>84 in.
  • Key Specs - Dump angle, degrees (E): 43 degree (angle)
  • Key Specs - Lift capacity at full height: Measured at pivot (U)<br/>1000 kg<br/>2200 lb<br/>
  • Key Specs - Maximum lift height (A): 2850 mm<br/>112 in.
  • Key Specs - Rollback angle, degrees (G): 30 degree (angle)
  • Loader - Base weight: 280.53 kg<br/>618.46 lb
  • Loader - Boom breakout force: Measured at pivot (Y)<br/>2019 kg<br/>4451 lb<br/>Measured at 800 mm ahead of pivot (Z)<br/>1335 kg<br/>2944 lb<br/>
  • Loader - Bucket angle: Dump angle, degrees (E)<br/>43 degree (angle)<br/>Rollback angle, degrees (G)<br/>30 degree (angle)<br/>
  • Loader - Bucket rollback force capacity: At maximum height (VV)<br/>979 kgf<br/>2158 lbf<br/>At ground-level line (ZZ)<br/>1410 kgf<br/>3109 lbf<br/>
  • Loader - Bucket used: 1850 mm<br/>73 in.
  • Loader - Bucket weight: 159 kg<br/>351 lb
  • Loader - Cycle times: <br/><br/>
  • Loader - Digging depth (H): 180 mm<br/>7 in.
  • Loader - Dimensions: Maximum lift height (A)<br/>2850 mm<br/>112 in.<br/>At full height - bucket level(B)<br/>2605 mm<br/>102.5 in.<br/>At full height - bucket dumped (C)<br/>2140 mm<br/>84 in.<br/>
  • Loader - Lift capacity at 59 in. (1500 mm): Measured at pivot (W)<br/>1380 kg<br/>3043 lb<br/>Measured at 800 mm ahead of pivot (X)<br/>980 kg<br/>2161 lb<br/>
  • Loader - Lift capacity at full height: Measured at pivot (U)<br/>1000 kg<br/>2200 lb<br/>Measured at 800 mm ahead of pivot (V)<br/>682 kg<br/>1500 lb<br/>
  • Loader - Overall height in carry position (J): 1.442 m<br/>4.75 ft
  • Loader - Overall length (I+F), ft (m): 3.79 m<br/>12.416 ft
  • Loader - Reach: At maximum height (D)<br/>615 mm<br/>24 in.<br/>At ground level - bucket level (F)<br/>1730 mm<br/>68 in.<br/>
  • Tractor - Front tire: 7.5-16 6 PR R1
  • Tractor - Model: 5E Series 2WD Tractor
  • Tractor - Pump capacity: 11.4 gpm
  • Tractor - Rated pressure: 2828 psi
  • Tractor - Rear tire: 13.6-28 6 PR R1

Features

  • Lift Capacity: 1500-1580 lbs (682-718 kg)
  • Lift Height: 112-114 in. (2.850-2.895 m)

Copy Set

Changing attachments

The John Deere quick-change attachment carrier allows one person to quickly change attachments without the use of tools.

Step 1
Retaining pin Retaining pin
Detail of indicated area with pin in storage area Detail of indicated area with pin in storage area

With the bucket level or slightly rolled back, simply remove the retaining pins and place in storage position.

Step 2
Roll the attachment forward to disengage pins Roll the attachment forward to disengage pins

Roll the attachment forward to disengage the lower pins.

Step 3
Lower attachment to ground-disengage top hooks Lower attachment to ground-disengage top hooks

Lower the attachment to the ground to disengage the top hooks.

Step 4
Back away from attachment Back away from attachment

Back away.

To install another attachment simply reverse these steps.

Parking stands and couplers

Parking stand Parking stand
Parking stand coupler Parking stand coupler

For parking the 512 Loader.

 

To see instructions on how to park the loader using the stands, go to parking stand section.

Contact

Contact

Consignment

Request a Service

×

Sloan Implement Employee Portal

×

Your session will expire in . If you want to reset this timer, please click OK.

Change Your Preferred Location